Mottram St. Andrew, Cheshire
Starlink Installation
This Grade II listed building in Mottram St. Andrew required a very discreet installation, so we needed to use a secure nine-inch bracket along with a minimum length, two-inch steel mast and shelly clamp. Nevertheless, the Starlink receiver had a perfectly clear line of sight and quickly became connected, providing superfast broadband speeds for the customer’s office!
continue reading
Related Posts
This Starlink installation was on a remote farm in Woodplumpton, just north of Preston.
This Starlink installation was carried out on a picturesque but very chilly day in Taylor Park, St. Helens.
This project in rural Wigan required the 12 x 12 inch galvanised wall bracket to gain clearance from the guttering.